Highett

The goal was to maximise the site, while taking into account the opportunities and constraints. The end result was a funky design that fits well into the area. Obviously, the clients were very pleased with the result, and so were we.

Time frame: 6 months for town planning approval

Configuration:

Dwelling 1 – Two storey, 4 bedroom, 2.5 bathroom, 2 living areas, double garage

Dwelling 2 – Two storey, 4 bedroom, 2.5 bathroom, 2 living areas, double garage

  • Budget: